Synchrotech 3-4 HUB GSR ITR B16 H22 (92-01)
Fitting: B18C B16A B16B H22 F20B 1992-2001
GSR ITR B16 B17 (S80 Y80 YS1 Y21 S21 S4C S9B)
H22 Prelude/Euro Accord (T2T4 T2W4 U2Q7 M2Y4 M2U4 M2F4 M2A4 M2B4)
Processing and preparation for shipping typically takes 3-4 business days before your order is shipped. In some cases this lead time may be shorter and sometimes longer. In the case where it may take longer then expected you will be contacted Via email by our support team. If you order an item that's on backorder, we will reach out with an estimated arrival time as soon as one is provided. We do not control the time in transit but however select the best shipping carrier for your order.
Thanks for subscribing!
This email has been registered!